New construction and remodel painting in Mandeville
New construction and remodel painting is a phased job that has to coordinate with other trades. The sequence — primer, finish, trim, punch-list — is what separates a clean new build from a rushed one.
Surfaces & Scope
Fresh drywall, new trim and doors, cabinets, and any existing surfaces tied into the remodel.
What Your Estimate Should Account For
Tell us where you are in the build and which trades are still on site. We schedule around electricians, flooring, and cabinet installers to avoid rework.
Preparation & Finish Choices
We prime fresh gypsum, seal repairs, apply finish coats in the right trade order, and finish with a punch-list walkthrough to catch every touch-up.
Planning Tip
Schedule paint after rough trades and flooring but before final fixture install — painting too early means touch-ups; too late means protecting finished work.
What's Included
- Primer seal on fresh gypsum
- Phased scheduling with sub-trades
- Final punch-list walkthrough
Common Questions
When in the build do you paint?
After drywall finish and prime, with finish coats after flooring and before final fixtures, then a punch-list pass at the end.
Do you coordinate with my contractor?
Yes. We work directly with your GC or builder and phase our work to fit the construction schedule.
What is a punch-list walkthrough?
A final pass where we and you walk every room and mark any touch-ups before the job is signed off.
Quote New construction and remodel painting
Call or text our Mandeville estimators for clear, written pricing on this service.